Tuesday, September 30, 2014

Making the Grade

On this beautiful fall morning, I snapped a picture of the heavy machinery working on the slope surrounding the library addition.
The roof is taking shape, and you can see how the addition connects to the existing building (where the bright green board is!).

Inside, walls are going in.  These will be the study rooms and offices in the Learning Centers.
As we near the middle of the fall semester, we hope our students are enjoying their college experience.  And we are looking forward to welcoming you to our new facility in just a few months!

Thursday, August 28, 2014

Onward and upward

As library staff were moving around campus this summer - we're currently in the Wellness Center, check in next week for pictures! - construction on the library continued.  In mid-August, the beams were placed for the addition:


...and as of today (August 28), the addition looks like this from the outside.

Here you can see workers installing the tongue-and-groove flooring.

Inside looking out.

Offices are taking shape upstairs.


The stairs are still visible from the outside.

You can almost imagine yourself in the lower level of the addition (this space will house the archives and our book collection).

The new library instruction room and the technology experimentation space ("sandbox").


And finally, in case you were wondering what happened to those old "Quiet Zones" signs we used to have....they're STILL hanging on!!
(Dave, could you keep it down??)

Friday, August 8, 2014

Looking back

...at the back of the library, that is!
Here is a picture of the original back side of our building.
This is what it looked like on June 17, 2014.
And as of yesterday, (August 7, 2014) we have new, bigger windows!
These will give students working in the lower level of the library a beautiful view of the surrounding hills, and allow for more natural light.

Tuesday, July 29, 2014

Where'd Those Windows Go?

Do you notice anything missing?

Here are the chunks of the roof!


It is so strange to see the stairs from the outside like this...

Friday, July 25, 2014

A Bird's-eye View

While work has been progressing over the past few weeks, there isn't much we can see changing from the outside! But thanks to a friend of the library, we have a pic from above that gives you an idea of the library's new "footprint."
From here you can see the size of the front addition, and the pieces of the roof overhang that have been removed in preparation for the second-story addition on top of the currently visible lower level.

Also, last week the trees that lined the sidewalk from the main circle to the library were removed.
They will eventually be replaced by taller trees, creating a "vaulted" look leading to the library entrance.

Wednesday, July 2, 2014

More Interior Views

Yesterday we were able to check out what has been going on inside the building - here are a few interesting developments!

From the outside:
Some of the plywood has been removed from the front.

Progress continues on the inside of the addition.
Upstairs:
As you come in the front door, this is the view to your right (the west end of the building).
 
These will be the CTIE and IT Helpdesk offices on the northwest side (front of the building).
And these are library staff offices on the southwest side (back of the building).


Here we are looking to the northeast corner, future tutoring offices and study spaces. 

And here is the rather iconic "gallery shot," showing the main floor from end-to-end.

Now we'll head downstairs....


...but watch your step as we get to the bottom!

Downstairs:
Looking east toward the Learning Center building - the new library instruction room is taking shape!

Looking out into our new addition, where our books will be located.


Two shots of the new, larger windows on the south side (back) of the building.

Thanks for stopping by!  And remember that while all of this is going on, the library staff is still available to help you - we are currently in rooms C205 and C206 in the Classroom Building!

Tuesday, June 24, 2014

4 Months of Progress

Three similar pictures, taken from the east end of the building facing west (toward the Science building/parking lot).
So much has changed so quickly!

Outside, work continues on the addition, and the new heating/air conditioning unit is now placed on its concrete pad behind the building.